Datascope Corp Recalls
Showing 1-11 of 11 recalls
Datascope CS 100 Intra-Aortic Balloon Pump and Datascope CS 300 Intra-Aortic Balloon Pump, Datascope Corp. Mahwah, NJ 07430
Defective Circuit Board -- A defect in the Printed Circuit Board's (PCB) in the CS 100 and CS300 Intra-Aortic Balloon Pump may cause the pump to exhibit intermittent malfunctions, which include failure to start-up or reset of the display screen during therapy.
Datascope sent a Product Field Correction notification letters to Hospital Administrators, via certified mail, on November 19, 2007. The letter informed them of a defect in the circuit board. It described the possible malfunction and provided instructions should malfunctioning occur. Datascope will be replacing the defective circuit boards in all affected IABP units. A Service Representative will be contacting the hospital to arrange for the replacement of the defective board.
Spectrum Patient Monitor, Physiological, Patient with arrhythmia detection or alamrs. Monitor can monitor, display, trend and print a patient''s physiological parameters. The device has a 12.1 inch color display and has a standard configuration of a 3 or 5 lead ECG, Masimo SET SpO2, non-invasive blood pressure, respiration, continuous temperature and IV Drug Calculations. Optional digital displays are provided for invasive blood pressure (up to four) anesthetic agents, O2 and NO2, ST, and CO2
Software anomalies which include shut down while printing, invalid diastolic blood pressure display, and incomplete and inaccurate interpretation reports of 12-Lead ECG data.
Datascope sent out a Field Correction notice on 9/7/2005 to all Hospital administrators who have the monitors. This was sent out via certified mail, return receipt requested. A Datascope Service Rep will conduct and document the corrective action during a visit to the customer.
Anestar Anesthesia Delivery System
Failure of the Anestar AC Main Power Switch. Battery should last 30 minutes, then ventilation and monitoring will fail.
A Field Correction action was initiated in June, 2003 and completed by the service reps in April, 2004.